Workflows & Statuses
This page is for the person who sets up how work moves through a project. After reading it you can choose a starting workflow, rename and reorder its columns, cap how many items a column holds, and restrict which moves are allowed.
A workflow is the set of named status columns that items move through in a project. Each column has:
- Name — the label shown on the board (e.g., "In Progress")
- Category —
todo,in_progress, ordone - WIP limit — optional cap on how many items can be in this column at once
- Order — left-to-right position on the board
Every project has exactly one workflow, and you can change it at any time. A workflow can also restrict which moves are allowed; see Strict transitions.
Built-in Project Types
When you create a project, its type determines the starting workflow. Everything can be changed afterwards.
| Type | Style | Default Columns |
|---|---|---|
software, web, mobile | Scrum | Backlog → To Do → In Progress → In Review → Done |
construction | Phase-based, strict | Permit → Procurement → Build → Inspect → Handover |
legal | Phase-based, strict | Intake → Discovery → Drafting → Review → Closed |
research | Kanban | Hypothesis → Design → Experiment → Analysis → Published |
event | Phase-based | Ideas → Booked → In Progress → Confirmed → Done |
personal, homework | Simple | To Do → Doing → Done |
maintenance | Kanban | Queue → In Progress → Review → Done |
custom | Simple | To Do → Doing → Done (fully editable) |
Strict transitions
Most workflows let you move an item to any column. A workflow can instead list the moves it allows. The construction and legal types start that way, and a move that is not listed is refused with an error that names both statuses.
The construction workflow allows:
| From | Allowed next step |
|---|---|
| Permit | Procurement |
| Procurement | Build |
| Build | Inspect |
| Inspect | Handover, or back to Build for rework |
So a "Build" item cannot jump to "Handover". This keeps required phases, such as regulatory sign-offs and physical dependencies, from being skipped. The legal workflow is the same kind of chain, with a step from Review back to Drafting.
The Workflow settings page edits columns, categories and WIP limits, and it keeps whatever moves the workflow already allows. To set or remove the allowed moves, put transitions in a project file or send them through the API, as below.
Changing a workflow after creation
In the UI. Settings → Workflow: rename columns, change their category, set WIP limits, Add Status, then Save workflow.
Existing items keep their current status name. If you rename a column, items in the old status are not moved automatically; move them on the board.
In a project file. The project.workflow key takes a preset (scrum, kanban, simple, construction, legal, research or event) or the statuses in order, with optional transitions. A workflow in a file must have at least one todo, one in_progress and one done status and no repeated names, and the file applies it only when it creates a project.
Through the API.
curl -X PATCH http://localhost:3210/api/projects/{id} \
-H "Content-Type: application/json" \
-d '{
"workflow": {
"workflow_type": "construction",
"statuses": [
{"name":"Permit", "category":"todo", "wip_limit":null, "order":0},
{"name":"Procurement", "category":"todo", "wip_limit":null, "order":1},
{"name":"Build", "category":"in_progress", "wip_limit":3, "order":2},
{"name":"Inspect", "category":"in_progress", "wip_limit":1, "order":3},
{"name":"Handover", "category":"done", "wip_limit":null, "order":4}
],
"transitions": [
{"from":"Permit","to":"Procurement"},
{"from":"Procurement","to":"Build"},
{"from":"Build","to":"Inspect"},
{"from":"Inspect","to":"Handover"},
{"from":"Inspect","to":"Build"}
]
}
}'
Leave out transitions (or send null) to allow every move.
WIP Limits
A WIP limit caps the number of items in a column. A move into a full column is refused (the card snaps back in the UI), and the API answers with an error that names the column and its limit.
WIP limits are enforced on new moves, not retroactively. If you set a limit of 3 on a column that already has 5 items, the existing 5 are unaffected — but no more can enter until the count drops below 3.
Set limits on bottleneck stages (code review, inspection, QA) to surface overload before it compounds.
Status Categories
Every column belongs to one category:
| Category | Meaning | Side effects |
|---|---|---|
todo | Not started | New items start in the first one |
in_progress | Being worked on | Tack records when the item first moved in |
done | Complete | Tack records when it was completed; moving it back out clears that |
Categories are what Overview and starting tasks by itself (which offers the first to do status) read. The board shows only column names.
A parent keeps its own status
Moving the last child of an item to a Done column does not move the parent. A status is only ever set by a person: by hand, by applying a change set, or by importing a file. A run, a review or a finished child never moves a task. When every child is done, move the parent yourself.