| 2026-10-05 |
☑ WAVE 88 COMPLETE — Phase 38 CLOSED 2026-10-05 — the execution envelope (D-55), Waves 85–88 (opened 2026-10-05) |
todo-waves.md |
18,813 |
| 2026-10-05 |
☑ WAVES 89–90 COMPLETE — the carried items, CLOSED 2026-10-05 (no phase; opened 2026-10-05) |
todo-waves.md |
16,884 |
| 2026-10-04 |
☑ WAVE 73 COMPLETE — Phase 35 CLOSED 2026-10-04 — docket in a harness-agnostic factory (D-51), Waves 71–75 (opened 2026-09-29) |
todo-waves.md |
29,104 |
| 2026-10-04 |
☑ WAVE 81 COMPLETE — Phase 36 CLOSED 2026-10-04 — consultation packs and evidence-v1 (D-53), Waves 76–81 (opened 2026-10-04) |
todo-waves.md |
16,391 |
| 2026-10-04 |
☑ WAVE 84 COMPLETE — Phase 37 CLOSED 2026-10-04 — verification-ready execution (D-54), Waves 82–84 (opened 2026-10-04) |
todo-waves.md |
14,730 |
| 2026-09-28 |
◆ PHASE 33 — COMPLETE (opened 2026-09-28, closed 2026-09-28): export privacy levels (D-49) |
todo-waves.md |
23,540 |
| 2026-09-28 |
◆ PHASE 34 — COMPLETE (opened 2026-09-28, closed 2026-09-29): the operator loop (D-50) |
todo-waves.md |
47,193 |
| 2026-09-27 |
◆ PHASE 29 — COMPLETE (opened 2026-09-27, closed 2026-09-27): the provider catalog (D-45) |
todo-waves.md |
26,930 |
| 2026-09-27 |
◆ PHASE 30 — COMPLETE (opened 2026-09-27, closed 2026-09-27): the team lives in the repo (D-46) |
todo-waves.md |
19,348 |
| 2026-09-27 |
◆ PHASE 31 — COMPLETE (opened 2026-09-27, closed 2026-09-27): recipes as a library, and the repository's standards (D-47) |
todo-waves.md |
31,744 |
| 2026-09-27 |
◆ PHASE 32 — COMPLETE (opened 2026-09-27, closed 2026-09-28): observability as configuration (D-48) |
todo-waves.md |
46,258 |
| 2026-09-26 |
◆ PHASE 27 — COMPLETE (opened 2026-09-26, closed 2026-09-26): per-pod configuration and portable teams (D-43) |
todo-waves.md |
27,664 |
| 2026-09-26 |
◆ PHASE 28 — COMPLETE (opened 2026-09-26, closed 2026-09-26): configuration format v1 and the two extension points (D-44) |
todo-waves.md |
20,002 |
| 2026-09-25 |
◇ WAVE 37 CLOSED (2026-09-25) — defects found by running the product (D-41) |
todo-waves.md |
10,940 |
| 2026-09-25 |
◆ PHASE 26 — COMPLETE (opened 2026-09-25, closed 2026-09-26): the configuration contract (D-42) |
todo-waves.md |
36,055 |
| 2026-09-21 |
◇ WAVE 36 CLOSED (2026-09-21) — eleven defects the documentation audit found in code |
todo-waves.md |
19,222 |
| 2026-09-14 |
PHASE 23 — Product truth and ecosystem proof (☑ COMPLETE 2026-09-14 — Waves 26–29; W29-C7's closing half removed by D-39) |
roadmap-phases.md |
12,841 |
| 2026-09-14 |
◇ WAVE 29 CLOSED (2026-09-14) — adoption evidence and public release |
todo-waves.md |
6,343 |
| 2026-09-13 |
◇ WAVE 34 CLOSED (2026-09-13) — finish the D-36 function split, two measured fixes, one audit |
todo-waves.md |
16,893 |
| 2026-09-13 |
◇ WAVE 35 CLOSED (2026-09-13) — second docstring sweep, one dead flag, one lane rule |
todo-waves.md |
15,483 |
| 2026-09-12 |
◇ WAVE 32 CLOSED (2026-09-12) — documentation truth pass and two deferred follow-ups |
todo-waves.md |
1,977 |
| 2026-09-11 |
☑ WAVE 31 COMPLETE (2026-09-11 to 2026-09-12) — human maintainability: test lanes, comment budget, generated docs (Phase 25, D-36) |
todo-waves.md |
43,947 |
| 2026-09-11 |
☑ WAVE 30 COMPLETE (2026-09-11 to 2026-09-12) — harness mode seams and contract (Phase 24, D-35) |
todo-waves.md |
14,956 |
| 2026-09-02 |
☑ WAVE 28 COMPLETE (2026-09-02) — portable governance proof |
todo-waves.md |
23,624 |
| 2026-09-01 |
☑ WAVE 27 COMPLETE (2026-09-01) — dependency safety and public front door |
todo-waves.md |
6,988 |
| 2026-08-31 |
☑ WAVE 26 COMPLETE (2026-08-31) — first successful turn and release/governance truth |
todo-waves.md |
52,820 |
| 2026-08-30 |
☑ WAVE 25 COMPLETE (2026-08-30) — live-model request and outcome truth |
todo-waves.md |
48,706 |
| 2026-08-19 |
☑ WAVE 24 COMPLETE (2026-08-19) — realistic local-model evaluation |
todo-waves.md |
8,250 |
| 2026-08-19 |
☑ WAVE 23 COMPLETE (2026-08-19) — real local-model workflow evidence |
todo-waves.md |
6,649 |
| 2026-08-19 |
☑ WAVE 22 COMPLETE (2026-08-19) — observable full-workflow proof |
todo-waves.md |
3,585 |
| 2026-08-19 |
☑ WAVE 21 COMPLETE (2026-08-19) — daemon-free truth pass |
todo-waves.md |
2,016 |
| 2026-08-19 |
☑ WAVE 20 COMPLETE (2026-08-19) — bounded development context and live-turn efficiency |
todo-waves.md |
10,750 |
| 2026-08-05 |
▶ LOCAL ENVIRONMENT — rebuilt and verified against the real tree (2026-08-05) |
todo-waves.md |
5,534 |
| 2026-08-05 |
☑ WAVE 19 COMPLETE (2026-08-05) — what running a real pod found; board CLEAR |
todo-waves.md |
7,104 |
| 2026-08-05 |
☑ WAVE 18 COMPLETE (2026-08-05) — two false security claims, both now true; board CLEAR |
todo-waves.md |
3,745 |
| 2026-08-05 |
☑ WAVE 18 board (closed) — opened 2026-08-05 |
todo-waves.md |
3,026 |
| 2026-08-05 |
☑ WAVE 17 COMPLETE (2026-08-05) — the MCP wire landed |
todo-waves.md |
3,805 |
| 2026-08-05 |
☑ WAVE 17 board (closed) — opened 2026-08-05 |
todo-waves.md |
2,839 |
| 2026-08-04 |
☑ WAVE 16 — Phase 22 COMPLETE (2026-08-04). All six cards shipped |
todo-waves.md |
3,095 |
| 2026-08-04 |
☑ WAVE 16 board (closed) — Phase 22, the control-plane write API (opened 2026-08-04) |
todo-waves.md |
3,193 |
| 2026-08-04 |
☑ Wave 13 close (2026-08-04) — Phases 19, 20 and 21 all shipped |
todo-waves.md |
1,147 |
| 2026-08-04 |
☑ WAVE 14 — the cleanup wave (2026-08-04). Docs re-trued, dead code gone, archaeology stripped |
todo-waves.md |
2,709 |
| 2026-08-04 |
☑ WAVE 15 — the last legacy sweep (2026-08-04) |
todo-waves.md |
3,550 |
| 2026-08-04 |
PHASE 22 — Control-plane write API for an external plan-of-record (☑ COMPLETE — all 6 cards, wave 16, 2026-08-04) |
roadmap-phases.md |
9,065 |
| 2026-08-03 |
PHASE 19 — docket takes the runtime (D-19) (☑ COMPLETE — all 13 cards, waves 8–11, closed 2026-08-03) |
roadmap-phases.md |
3,501 |
| 2026-07-31 |
Wave 7 — ☑ COMPLETE (2026-07-31) — and with it, the whole Platformization program |
todo-waves.md |
6,947 |
| 2026-07-31 |
Dead-code register — wave 3-6 sweep (CL-3, 2026-07-31) |
todo-waves.md |
10,940 |
| 2026-07-31 |
Phase 19 — docket owns the runtime (opened 2026-07-31) |
todo-waves.md |
34,566 |
| 2026-07-31 |
PHASE 15 — Platformization II: deterministic governance, wired (☑ COMPLETE — all 6 cards G-1…G-6 shipped; G-3 closed it 2026-07-31) |
roadmap-phases.md |
3,868 |
| 2026-07-31 |
PHASE 17 — Platformization IV: context engineering & memory management (☑ COMPLETE — all 5 cards C-1…C-5 shipped; C-3/C-5 closed it 2026-07-31) |
roadmap-phases.md |
2,376 |
| 2026-07-30 |
Wave 5 — ☑ COMPLETE (2026-07-30, all five merged; Phase 16 finished with it) |
todo-waves.md |
1,652 |
| 2026-07-30 |
Wave 6 — ☑ COMPLETE (2026-07-30, all five merged) |
todo-waves.md |
1,481 |
| 2026-07-30 |
Dead-code register (CL-1, 2026-07-30) — the standing "no legacy code" work list |
todo-waves.md |
5,812 |
| 2026-07-30 |
PHASE 14 — Platformization I: runtime truth & dispatch hardening (☑ COMPLETE 2026-07-30) |
roadmap-phases.md |
8,187 |
| 2026-07-30 |
PHASE 16 — Platformization III: declarative orchestration & diverse role archetypes (☑ COMPLETE — all 8 cards W-1…W-8 shipped 2026-07-30) |
roadmap-phases.md |
22,523 |
| 2026-07-30 |
PHASE 18 — Platformization V: runtime-driver port, LLM agnosticism & MCP (☑ COMPLETE — L-1/L-2/L-3/L-6 shipped; L-4 and L-5 both answered as spikes, 2026-07-30) |
roadmap-phases.md |
3,460 |
| 2026-07-02 |
PHASE 12 — Consolidation & hardening (☑ COMPLETE 2026-07-02) |
roadmap-phases.md |
4,827 |
| 2026-07-02 |
PHASE 13 — Close the differentiation gaps (☑ COMPLETE 2026-07-02) |
roadmap-phases.md |
6,142 |
| 2026-06-25 |
PHASE 11 — Competitive differentiation (OpenClaw fleet-management space) (☑ COMPLETE 2026-06-25) |
roadmap-phases.md |
5,403 |
| 2026-06-12 |
PHASE 6b — Tier-less role→model policy: unified agent/model architecture (✅ complete 2026-06-12) |
roadmap-phases.md |
11,113 |