Skip to content

Cycles ended — the archive of closed work

Everything here was moved verbatim out of TODO.md, ROADMAP.md and .agents/handoffs/, first on 2026-09-11 so the live files carry only active and planned work. Nothing here is outstanding and nothing here is a source of tasks. manifest.json records every archived section's heading, byte length and SHA-256; verify with:

uv run python scripts/maint/split_board.py check docs/cycles-ended/manifest.json
File Holds
todo-waves.md Closed board sections: waves, phase boards and registers (56 archived)
roadmap-phases.md Completed-initiative and phase records (23 archived)
roadmap-changelog.md The roadmap decision changelog (new entries go under its live heading) (1 archived)
handoffs/ Superseded coordinator handoff packets

Index by date (newest first)

Date Section File Bytes
2026-10-05 ☑ WAVE 88 COMPLETE — Phase 38 CLOSED 2026-10-05 — the execution envelope (D-55), Waves 85–88 (opened 2026-10-05) todo-waves.md 18,813
2026-10-05 ☑ WAVES 89–90 COMPLETE — the carried items, CLOSED 2026-10-05 (no phase; opened 2026-10-05) todo-waves.md 16,884
2026-10-04 ☑ WAVE 73 COMPLETE — Phase 35 CLOSED 2026-10-04 — docket in a harness-agnostic factory (D-51), Waves 71–75 (opened 2026-09-29) todo-waves.md 29,104
2026-10-04 ☑ WAVE 81 COMPLETE — Phase 36 CLOSED 2026-10-04 — consultation packs and evidence-v1 (D-53), Waves 76–81 (opened 2026-10-04) todo-waves.md 16,391
2026-10-04 ☑ WAVE 84 COMPLETE — Phase 37 CLOSED 2026-10-04 — verification-ready execution (D-54), Waves 82–84 (opened 2026-10-04) todo-waves.md 14,730
2026-09-28 ◆ PHASE 33 — COMPLETE (opened 2026-09-28, closed 2026-09-28): export privacy levels (D-49) todo-waves.md 23,540
2026-09-28 ◆ PHASE 34 — COMPLETE (opened 2026-09-28, closed 2026-09-29): the operator loop (D-50) todo-waves.md 47,193
2026-09-27 ◆ PHASE 29 — COMPLETE (opened 2026-09-27, closed 2026-09-27): the provider catalog (D-45) todo-waves.md 26,930
2026-09-27 ◆ PHASE 30 — COMPLETE (opened 2026-09-27, closed 2026-09-27): the team lives in the repo (D-46) todo-waves.md 19,348
2026-09-27 ◆ PHASE 31 — COMPLETE (opened 2026-09-27, closed 2026-09-27): recipes as a library, and the repository's standards (D-47) todo-waves.md 31,744
2026-09-27 ◆ PHASE 32 — COMPLETE (opened 2026-09-27, closed 2026-09-28): observability as configuration (D-48) todo-waves.md 46,258
2026-09-26 ◆ PHASE 27 — COMPLETE (opened 2026-09-26, closed 2026-09-26): per-pod configuration and portable teams (D-43) todo-waves.md 27,664
2026-09-26 ◆ PHASE 28 — COMPLETE (opened 2026-09-26, closed 2026-09-26): configuration format v1 and the two extension points (D-44) todo-waves.md 20,002
2026-09-25 ◇ WAVE 37 CLOSED (2026-09-25) — defects found by running the product (D-41) todo-waves.md 10,940
2026-09-25 ◆ PHASE 26 — COMPLETE (opened 2026-09-25, closed 2026-09-26): the configuration contract (D-42) todo-waves.md 36,055
2026-09-21 ◇ WAVE 36 CLOSED (2026-09-21) — eleven defects the documentation audit found in code todo-waves.md 19,222
2026-09-14 PHASE 23 — Product truth and ecosystem proof (☑ COMPLETE 2026-09-14 — Waves 26–29; W29-C7's closing half removed by D-39) roadmap-phases.md 12,841
2026-09-14 ◇ WAVE 29 CLOSED (2026-09-14) — adoption evidence and public release todo-waves.md 6,343
2026-09-13 ◇ WAVE 34 CLOSED (2026-09-13) — finish the D-36 function split, two measured fixes, one audit todo-waves.md 16,893
2026-09-13 ◇ WAVE 35 CLOSED (2026-09-13) — second docstring sweep, one dead flag, one lane rule todo-waves.md 15,483
2026-09-12 ◇ WAVE 32 CLOSED (2026-09-12) — documentation truth pass and two deferred follow-ups todo-waves.md 1,977
2026-09-11 ☑ WAVE 31 COMPLETE (2026-09-11 to 2026-09-12) — human maintainability: test lanes, comment budget, generated docs (Phase 25, D-36) todo-waves.md 43,947
2026-09-11 ☑ WAVE 30 COMPLETE (2026-09-11 to 2026-09-12) — harness mode seams and contract (Phase 24, D-35) todo-waves.md 14,956
2026-09-02 ☑ WAVE 28 COMPLETE (2026-09-02) — portable governance proof todo-waves.md 23,624
2026-09-01 ☑ WAVE 27 COMPLETE (2026-09-01) — dependency safety and public front door todo-waves.md 6,988
2026-08-31 ☑ WAVE 26 COMPLETE (2026-08-31) — first successful turn and release/governance truth todo-waves.md 52,820
2026-08-30 ☑ WAVE 25 COMPLETE (2026-08-30) — live-model request and outcome truth todo-waves.md 48,706
2026-08-19 ☑ WAVE 24 COMPLETE (2026-08-19) — realistic local-model evaluation todo-waves.md 8,250
2026-08-19 ☑ WAVE 23 COMPLETE (2026-08-19) — real local-model workflow evidence todo-waves.md 6,649
2026-08-19 ☑ WAVE 22 COMPLETE (2026-08-19) — observable full-workflow proof todo-waves.md 3,585
2026-08-19 ☑ WAVE 21 COMPLETE (2026-08-19) — daemon-free truth pass todo-waves.md 2,016
2026-08-19 ☑ WAVE 20 COMPLETE (2026-08-19) — bounded development context and live-turn efficiency todo-waves.md 10,750
2026-08-05 ▶ LOCAL ENVIRONMENT — rebuilt and verified against the real tree (2026-08-05) todo-waves.md 5,534
2026-08-05 ☑ WAVE 19 COMPLETE (2026-08-05) — what running a real pod found; board CLEAR todo-waves.md 7,104
2026-08-05 ☑ WAVE 18 COMPLETE (2026-08-05) — two false security claims, both now true; board CLEAR todo-waves.md 3,745
2026-08-05 ☑ WAVE 18 board (closed) — opened 2026-08-05 todo-waves.md 3,026
2026-08-05 ☑ WAVE 17 COMPLETE (2026-08-05) — the MCP wire landed todo-waves.md 3,805
2026-08-05 ☑ WAVE 17 board (closed) — opened 2026-08-05 todo-waves.md 2,839
2026-08-04 ☑ WAVE 16 — Phase 22 COMPLETE (2026-08-04). All six cards shipped todo-waves.md 3,095
2026-08-04 ☑ WAVE 16 board (closed) — Phase 22, the control-plane write API (opened 2026-08-04) todo-waves.md 3,193
2026-08-04 ☑ Wave 13 close (2026-08-04) — Phases 19, 20 and 21 all shipped todo-waves.md 1,147
2026-08-04 ☑ WAVE 14 — the cleanup wave (2026-08-04). Docs re-trued, dead code gone, archaeology stripped todo-waves.md 2,709
2026-08-04 ☑ WAVE 15 — the last legacy sweep (2026-08-04) todo-waves.md 3,550
2026-08-04 PHASE 22 — Control-plane write API for an external plan-of-record (☑ COMPLETE — all 6 cards, wave 16, 2026-08-04) roadmap-phases.md 9,065
2026-08-03 PHASE 19 — docket takes the runtime (D-19) (☑ COMPLETE — all 13 cards, waves 8–11, closed 2026-08-03) roadmap-phases.md 3,501
2026-07-31 Wave 7 — ☑ COMPLETE (2026-07-31) — and with it, the whole Platformization program todo-waves.md 6,947
2026-07-31 Dead-code register — wave 3-6 sweep (CL-3, 2026-07-31) todo-waves.md 10,940
2026-07-31 Phase 19 — docket owns the runtime (opened 2026-07-31) todo-waves.md 34,566
2026-07-31 PHASE 15 — Platformization II: deterministic governance, wired (☑ COMPLETE — all 6 cards G-1…G-6 shipped; G-3 closed it 2026-07-31) roadmap-phases.md 3,868
2026-07-31 PHASE 17 — Platformization IV: context engineering & memory management (☑ COMPLETE — all 5 cards C-1…C-5 shipped; C-3/C-5 closed it 2026-07-31) roadmap-phases.md 2,376
2026-07-30 Wave 5 — ☑ COMPLETE (2026-07-30, all five merged; Phase 16 finished with it) todo-waves.md 1,652
2026-07-30 Wave 6 — ☑ COMPLETE (2026-07-30, all five merged) todo-waves.md 1,481
2026-07-30 Dead-code register (CL-1, 2026-07-30) — the standing "no legacy code" work list todo-waves.md 5,812
2026-07-30 PHASE 14 — Platformization I: runtime truth & dispatch hardening (☑ COMPLETE 2026-07-30) roadmap-phases.md 8,187
2026-07-30 PHASE 16 — Platformization III: declarative orchestration & diverse role archetypes (☑ COMPLETE — all 8 cards W-1…W-8 shipped 2026-07-30) roadmap-phases.md 22,523
2026-07-30 PHASE 18 — Platformization V: runtime-driver port, LLM agnosticism & MCP (☑ COMPLETE — L-1/L-2/L-3/L-6 shipped; L-4 and L-5 both answered as spikes, 2026-07-30) roadmap-phases.md 3,460
2026-07-02 PHASE 12 — Consolidation & hardening (☑ COMPLETE 2026-07-02) roadmap-phases.md 4,827
2026-07-02 PHASE 13 — Close the differentiation gaps (☑ COMPLETE 2026-07-02) roadmap-phases.md 6,142
2026-06-25 PHASE 11 — Competitive differentiation (OpenClaw fleet-management space) (☑ COMPLETE 2026-06-25) roadmap-phases.md 5,403
2026-06-12 PHASE 6b — Tier-less role→model policy: unified agent/model architecture (✅ complete 2026-06-12) roadmap-phases.md 11,113

Undated sections

Section File Bytes
Historical — Phase 19 waves 8-9 shipped; the daemon is unused todo-waves.md 5,308
Known-open gaps carried forward (do not let these get quietly re-claimed) todo-waves.md 4,275
0. Completed initiatives (historical record) roadmap-phases.md 1,526
5. Phase records (historical — every phase below is COMPLETE) roadmap-phases.md 15,596
PHASE 20 — Fleet observability (☑ COMPLETE at cut scope — D-24 cut ~half; P20-2 shipped, P20-4 was a phantom card) roadmap-phases.md 8,962
PHASE 21 — The product substrate (☑ COMPLETE at cut scope — P21-1 + P21-5 shipped; the rest cut by D-24) roadmap-phases.md 4,639
PHASE 5 — Channel portability + system snapshot (☑ COMPLETE) roadmap-phases.md 3,274
PHASE 6 — Model & provider agnosticism (☑ COMPLETE) roadmap-phases.md 18,553
PHASE 8 — Agent observability, guardrails & drift (HITL) (☑ COMPLETE) roadmap-phases.md 21,002
PHASE 9 — Contract integrity: close the spec↔runtime gap (de-ceremony) (☑ COMPLETE) roadmap-phases.md 11,054
PHASE 10 — Agent architecture: project pods (scope ≠ role ≠ lifecycle) (☑ COMPLETE) roadmap-phases.md 20,441
Changelog roadmap-changelog.md 74,031
W29-C1 — recover a corrupt Docket JSON primary from its valid backup todo-waves.md 3,255
W29-C2 — ship an extractable, artifact-installed ten-minute starter todo-waves.md 3,419
W29-C3 — define the adoption benchmark schema and deterministic runner todo-waves.md 3,207
W29-C4 — add adversarial governance and crash/recovery benchmark scenarios todo-waves.md 2,976
W29-C5 — publish truthful support, deprecation, governance, and succession policy todo-waves.md 2,884
W29-C6 — generate and publish the reproducible adoption baseline todo-waves.md 5,649
Planned program — PHASE 25: human maintainability (D-36) roadmap-phases.md 8,260
Planned program — PHASE 24: harness mode (D-35) roadmap-phases.md 7,010

Handoffs

  • handoffs/phase-23-productization.md — Wave 26 closure packet (2026-08-31); superseded by the Wave 27–29 records in roadmap-phases.md Phase 23.